the bridge is gonna be replaced by the oringinal floyd rose bridge, need to give it a bit more space at the bridge area. the end of the bridge slot was extended by 1/4 inch with dremel.

dada~ hard to tell the difference, but now the bridge won't touch the wood now.

time to work on the surface. lots of priming, sanding, filling .. all the scars from the previous days are gonna be covered.